Thanks to the high responsiveness of SIGN partner IGemetris and the specialized track monitoring system Amberg TrackControl, an automatic monitoring system was put into operation in less than half a day. The short measurement interval of less than 1 minute ensured maximum safety. The automatic GeoMonitoring contributed significantly to ensuring that the remediation work was carried out safely and that the railway line could be quickly returned to operation.
Tolochenaz – Track Subsidence Monitoring
Express Monitoring: Following track subsidence on the SBB Lausanne-Geneva line, the tracks are monitored around the clock to enable resumption of railway operations and ensure the safety of rail passengers.